https://snapshot.box/#/s:assangedao.eth/proposal/0x038ea366599180eee83edcdb77a1cb4710b2e3f13aa9a510fda9931d22a9213b
Timeline
Created
Nov 2, 2026 · 10:08 PM
Start
Nov 3, 2026 · 10:08 PM
End
Nov 5, 2026 · 10:08 PM
AIP-21: Supporting statements for the mission
1. Summary
AIP-18 made peace AssangeDAO’s mission. This proposal adds a vision, a set of values, and a short test for whether a piece of work fits the mission, so that holders, signers and applicants read the mission the same way.
2. Motivation
A mission says what the DAO is for. It does not say how to judge a proposal or a request for funds when the case is unclear. Most DAOs publish a few supporting statements for this. AssangeDAO’s earlier drafts of these (t/285) were never voted on.
3. Proposal Details
Vision
A world in which truth reduces the power of lies to start wars, and no one who speaks for peace has to stand alone.
Values
- Neutrality: we neither support nor oppose any political party, government, or candidate.
- Solidarity: the worldwide network that helped win Julian Assange his freedom is our model.
- Truth as the method: we pursue peace by making facts public and checkable.
- Open coordination: cryptography and public process, not closed deals.
- Accountability: every treasury action is posted in full before it is signed, so any holder can check it, unless an AIP provides otherwise.
- Dignity: we don’t use war or suffering to promote the DAO or the token.
The mission test
A proposal, project or grant fits the mission when the answer to all four questions is yes:
- Does it help resolve conflict or build understanding, or support people who speak up for peace?
- Does it respect the neutrality principle?
- Can the people receiving support lawfully accept it?
- Will they report back publicly on what was done?
These statements are published alongside the mission on the DAO’s website. They can be amended by a later AIP. This vote authorizes no treasury spending.
4. Voting Options
A. For
B. Against
C. Abstain
5. Implementation
Uploaded to Snapshot on 2 November 2026. Voting opens 24 hours after upload and lasts 48 hours. $JUSTICE-weighted. If it passes, the statements are published with the mission.
Thanks, zylo. I checked the Snapshot proposal against the final text in t/1105: the wording is the same. The vote opens on 4 November at 04:08 UTC and closes on 6 November at 04:08 UTC.
One note for voters: Snapshot is set to approval voting for the whole space, so please tick only one option, For, Against or Abstain.
Will AIP-22 (Perpetual Fund grants, [Proposal] AIP-22: Perpetual Fund grants, paid in $JUSTICE | AIP-22 提案:永续基金资助规则,以 $JUSTICE 发放) go up as well? The final text is in t/1105 #12. If it’s uploaded today, the two votes will close at about the same time.
The Chinese text of AIP-21 is in t/1105 #7: Next steps immediately after the mission is decided (Vision, Values, Goals) - #7 by innocent
───
中文
谢谢 zylo。我把 Snapshot 上的提案和 t/1105 中的最终文本核对过了,措辞一致。投票于 11 月 4 日 04:08 UTC(北京时间 12:08)开始,11 月 6 日 04:08 UTC(北京时间 12:08)结束。
提醒各位投票人:整个 Snapshot 空间设置为认可投票,请只勾选一个选项:赞成、反对或弃权。
AIP-22(永续基金资助规则,[Proposal] AIP-22: Perpetual Fund grants, paid in $JUSTICE | AIP-22 提案:永续基金资助规则,以 $JUSTICE 发放)也会上传吗?最终文本在 t/1105 #12。如果今天上传,两场投票会在差不多的时间结束。
AIP-21 的中文全文见 t/1105 #7:Next steps immediately after the mission is decided (Vision, Values, Goals) - #7 by innocent
Great to see these ideas moving forward. Thank you Zolly and Innocent for the efforts.
AIP-21 has passed: For 1,352.46M (99.4%), Against 0, Abstain 4.75M, from 28 votes. That’s 1.57 times the quorum. Thank you to everyone who voted.
@zylo, could you now upload AIP-22 (Perpetual Fund grants, [Proposal] AIP-22: Perpetual Fund grants, paid in $JUSTICE | AIP-22 提案:永续基金资助规则,以 $JUSTICE 发放)? It relies on the mission test that AIP-21 has just adopted. The final text, ready to paste, is the second code block in t/1105 #12: Next steps immediately after the mission is decided (Vision, Values, Goals) - #12 by innocent
If it goes up in the next few days, the vote will close well before the first round’s applications close on 30 November. I’ll update the dates in the forum posts to match Snapshot once it’s up.
───
中文
AIP-21 已通过:赞成 13.5246 亿(99.4%),反对 0,弃权 475 万,共 28 票,达到法定人数的 1.57 倍。感谢所有投票的持币人。
@zylo,现在可以上传 AIP-22(永续基金资助规则,[Proposal] AIP-22: Perpetual Fund grants, paid in $JUSTICE | AIP-22 提案:永续基金资助规则,以 $JUSTICE 发放)了吗?它要用到 AIP-21 刚刚通过的使命检验。可直接粘贴的最终文本是 t/1105 #12 里的第二个代码块:Next steps immediately after the mission is decided (Vision, Values, Goals) - #12 by innocent
如果在接下来几天内上传,投票会在第一轮申请截止日(11 月 30 日)之前很早结束。上传后,我会把论坛帖子里的日期改成与 Snapshot 一致。
@zylo_eth, following up on AIP-22. AIP-21 has passed, so the mission test it relies on is now in place. Could you upload AIP-22 to Snapshot in the next day or two?
The final text, ready to paste, is the second code block in t/1105 #12. Please update the Implementation paragraph to the actual upload date and remove the reference to uploading it together with AIP-21. The vote should open 24 hours after upload and last 48 hours, with For / Against / Abstain as the choices and t/1109 as the discussion link.
The first round’s applications are due to close on 30 November, and they only open if AIP-22 passes. Uploading soon would leave applicants more time. Once it’s up, I’ll check the text and update the forum dates to match Snapshot. If anything is still holding it up, please let us know here. Thank you.
───
中文
@zylo_eth,跟进一下 AIP-22。AIP-21 已经通过,它所依赖的使命检验也已确立。能否在接下来一两天内将 AIP-22 上传至 Snapshot?
可直接粘贴的最终文本在 t/1105 第 12 楼的第二个代码块。请将实施部分改为实际上传日期,并删除“与 AIP-21 一同上传”的表述。投票在上传 24 小时后开始,持续 48 小时;选项为赞成、反对、弃权,讨论链接使用 t/1109。
第一轮申请计划于 11 月 30 日截止,而申请要等 AIP-22 通过后才开放。尽快上传,可以给申请人多留一些时间。上传后,我会核对文本,并将论坛日期更新至与 Snapshot 一致。如果还有什么事项影响上传,也请在这里说明。谢谢。