AIP-21: Supporting statements for the mission

@zylo_eth, following up on AIP-22. AIP-21 has passed, so the mission test it relies on is now in place. Could you upload AIP-22 to Snapshot in the next day or two?

The final text, ready to paste, is the second code block in t/1105 #12. Please update the Implementation paragraph to the actual upload date and remove the reference to uploading it together with AIP-21. The vote should open 24 hours after upload and last 48 hours, with For / Against / Abstain as the choices and t/1109 as the discussion link.

The first round’s applications are due to close on 30 November, and they only open if AIP-22 passes. Uploading soon would leave applicants more time. Once it’s up, I’ll check the text and update the forum dates to match Snapshot. If anything is still holding it up, please let us know here. Thank you.

───
中文

@zylo_eth,跟进一下 AIP-22。AIP-21 已经通过,它所依赖的使命检验也已确立。能否在接下来一两天内将 AIP-22 上传至 Snapshot?

可直接粘贴的最终文本在 t/1105 第 12 楼的第二个代码块。请将实施部分改为实际上传日期,并删除“与 AIP-21 一同上传”的表述。投票在上传 24 小时后开始,持续 48 小时;选项为赞成、反对、弃权,讨论链接使用 t/1109。

第一轮申请计划于 11 月 30 日截止,而申请要等 AIP-22 通过后才开放。尽快上传,可以给申请人多留一些时间。上传后,我会核对文本,并将论坛日期更新至与 Snapshot 一致。如果还有什么事项影响上传,也请在这里说明。谢谢。